Reaction Web

Search REACTION projects Search REACTION projects

Map REACTION projects Map REACTION projects


VI. PROJECT ASSESSMENT 

VI.1. LANDSCAPE & ENVIRONMENTAL ASSESSMENT

1. Proportion of uses at regional scale (%) 
Agricultural: 38 
Forestry: 11 
Urban & Unproductive:
Others Uncultivated, marsh land, water lines  47 
Name of the reference region/province/county: 
Castro Marim County 

2. Which ecosystems/habitats once occurred and now occur in the project area?
  Before the project Present
% of project area Main species % of project area Main species
Mixed Mediterranean evergreen woodland forest       13  Pinus pinea Quercus suber 
Mediterranean shrublands (macchia, matorral, garrigue, phrygana,...)   Unk  Cistus ladanifer     
Evergreen oak woodland          
Deciduous forest          
Pine forest       77  Pinus pinea, Cistus ladanifer 
Other conifer forest          
Savannah-type ecosystem (e.g., dehesa)          
Steppes          
Permanent grassland, prairie          
Annual grassland          
Riparian ecosystem          
Orchards, tree crops, etc.          
Annual winter crops   Unk  Triticum spp.     
Annual summer crops          
Bare land (fallows)          
Please indicate the reference date (e.g., at the Vtime of project implementation; 25, 50, etc. years before project implementation; etc.):
At the time of project implementation 

3. In the project area, are there any abandoned agricultural terraces?
No
a) Date of abandonment of most of them -year(s) or decade(s):
 
b) Are they narrow (limiting agricultural mechanisation)?
No
c) What is their current degree of conservation?
- Good
- Medium
- Poor
d) Have they been repaired within the framework of the project?
No

4. Are there protected areas in the project area:
Yes
a) Describe relevant legislation (if any) related to species or habitat protection (add reference dates):
Ministerial Council Resolution n.º 66/2001 - Rede Natura 2000 
b) Natura 2000 and other protected habitats:
Yes, Guadiana 
c) Are there protected ecological corridors ?
Yes
Date:  
d) Is there a protected area network ?
Yes
Date:  

5. Landscape pattern:
(Please, provide maps if possible and indicate it in section I.2.3.) 
Yes No Partly Description
a) Is the project area connected to other similar ecosystem/habitat(s) in the surrounding area? - - YES All units are connected to scattered small forested areas  
b) Are project habitats fragmented into a number of patches? - - YES There are a few isolated small patches and national and forest roads roads create patches inside the stands 
c) Habitat patches within the project area are close enough to allow free interchange of species? - - YES The patches created by roads are, in most cases, clouse enough to allow the free interchange of species; However, some few isolated patches are not in the same situation 
d) Is there a natural gradation between habitats within the project area? - YES -  
e) Are project edges natural? - - YES Some project edges are social areas (Odeleite village and others), or traffic intensive National road 

6. Are there negative visual impacts?
a) Resulting from project implementation (e.g., terracing or subsoiling impacts):
No
Description:  
b) Resulting from project maintenance works
No
Description:  
c) Resulting from exploitation works
No
Description:  
d) Resulting from other works
No
Description:  

7. Flooding assessment at landscape/catchment scale
  Before the project Since project implementation
Reference period: n/a 
Reference period: n/a 
a) Flood frequency - Nil - Nil
- Once every 1-10 years  - Once every 1-10 years 
- Once every 10-20 years - Once every 10-20 years
- Once every 20-50 years - Once every 20-50 years
- Once every > 50 years - Once every > 50 years
b) Date of last recorded flood event (year(s))  Unknown  Unknown 
c) Comments on damages from last recorded flood event  Unknown  Unknown 

8. Erosion assessment at landscape/catchment scale
  Before the project Since project implementation
Reference period: n/a 
Reference period: n/a 
a) Erosion/sedimentation rate
(Mg ha-1 year-1) 
Unknown  Unknown 
b) Method of assessment
(USLE estimation, lake/reservoir/dam sedimentation, measurements at plot/catchment scale, etc.)
Unknown  Unknown 

REACTION: This research is supported by the "Energy, Environment and Sustainable Development" programme, under contract EVK2-2002-80025