1. Structures and facilities developed (if any) within the project. |
|
|
Roads: |
14.7 km of improved forest roads |
|
|
Fire protection ( fire breaks, ...): |
14.4 km of fire breaks, 1 small dam |
|
- |
Livestock (enclosure, passageways, etc.): |
|
|
|
Recreational facilities, for children, school groups, tourist, other: |
Belvedere, jogging trail, restaurant and picnic area |
|
- |
Technical measures of erosion control (ditches, dams,
etc.): |
|
|
- |
Special measures for electrical lines or gas transmission pipes: |
|
|
|
Other infrastructure: |
Park ranger house (area: 0.25 ha) |