|
|
IV. TECHNICAL DESCRIPTION BY RESTORATION
UNITS
|
IV.1. UNIT DESCRIPTION
|
1.- Project acronym/code (see I.1.1b): |
PQTN |
|
2.- Unit number/code (internal numerical code, related with the map indicate in I.2.3): |
2 |
|
3.- Specific objective (select from section III.1 and give details): |
Due to the torrential caracteristics of the mediterranean climate and to the soil type, the intention was to provide a more balanced use of the soil, resulting in increase soil and water conservation. Other objective is fruit production (pinyon) |
|
4.- Unit specificity due to: |
|
- |
Environmental characteristics |
|
- |
Technology |
|
|
Species used |
|
- |
Implementation period/stage |
|
- |
Previous land use |
|
- |
Intended/actual land use |
|
- |
Other: |
|
|
5. Surface extension, in relation to total
project (%): |
11 |
|
6. Implementation period of this unit (dates): |
1987 |
7. Any previous restoration actions applied to this unit?: |
No |
Description: |
|
Has the previous restoration action been described as a different unit? |
|
|
|
|
|
|
|
|
|
|
|
|
|
- |
Yes. Unit number/code: |
|
|
|
No. Please explain the reasons: |
|
|
|