1. Structures and facilities developed (if any) within the project. |
|
- |
Roads: |
The project included road construction. Today the road density is 21.82 Km/ha. |
|
- |
Fire protection ( fire breaks, ...): |
Firebreaks were constructed of a total length of 20 km and average width 12-20m. |
|
- |
Livestock (enclosure, passageways, etc.): |
|
|
- |
Recreational facilities, for children, school groups, tourist, other: |
|
|
- |
Technical measures of erosion control (ditches, dams,
etc.): |
|
|
- |
Special measures for electrical lines or gas transmission pipes: |
|
|
- |
Other infrastructure: |
|