III. RESTORATION PROCESS 

III.4. GENERAL TECHNICAL DESCRIPTION

1. Structures and facilities developed (if any) within the project.
- Roads: The project included road construction. Today the road density is 21.82 Km/ha. 
- Fire protection ( fire breaks, ...): Firebreaks were constructed of a total length of 20 km and average width 12-20m. 
- Livestock (enclosure, passageways, etc.):  
- Recreational facilities, for children, school groups, tourist, other:  
- Technical measures of erosion control (ditches, dams, etc.):  
- Special measures for electrical lines or gas transmission pipes:  
- Other infrastructure:  

2. Has any traditional technology been applied?
Yes
Description: Planting in pits handly (low planting) 

3. Has any innovative technology been applied?
No
Description:  

4. Are there any quality standards for the seedlings?
YES Yes
- No
- Unknown
Description: The seedlings were extracted from the nursery and transported to the field without any checking in the nursery. Before the planting the seedlings were checked in relation to root and shoot damages. On 

5. Are there quality standards for the work? 
YES Yes
- No
- Unknown
Description: Plantations were performed during cloudy days avoiding frosty or windy days. Seedlings were planted within the same day or on the next one day after the extraction from the nursery. Generally seedlings were planted with the main axis to be vertically 

6. Are there defined success criteria for the project?
No
Description:  

REACTION: This research is supported by the "Energy, Environment and Sustainable Development" programme, under contract EVK2-2002-80025