|
III. RESTORATION PROCESS
|
III.1. RESTORATION GOALS
|
1.- What were the general project's defined objectives?: |
Dune stabilisation |
|
2. Scope of the project: |
|
|
|
Restoration action/programme |
|
- |
Pilot restoration for policy makers and managers |
|
- |
Research |
|
- |
Educational |
|
- |
Other |
|
4. Functional goals and expected ecosystem services: |
|
- |
Productivity |
|
- |
Biodiversity conservation |
|
- |
Fire control |
|
- |
Air quality |
|
- |
Agriculture production |
|
- |
Riparian protection |
|
- |
Weed control |
|
- |
CO2 sink |
|
- |
Forestry production |
|
- |
Wildlife habitat |
|
- |
Seed source |
|
- |
Grazing/pasture lands |
|
- |
Erosion control |
|
- |
Water infiltration |
|
- |
Hunting |
|
- |
Flood control |
|
- |
Water filtration/quality |
|
|
Other: |
Stabilisation of coastal dunes |
|
5. Goals at landscape level: |
|
- |
Increase connectivity |
|
- |
Increase landscape diversity |
|
- |
Increase forest surface |
|
- |
Rural planning |
|
|
Other: |
Forest stablisment |
|
6. Which ecosystem goods were expected to be
obtained/increased? |
|
|
Wood products |
|
- |
Non-timber forest products (e.g., edible mushrooms, aromatic plants, etc.). Please specify: |
|
|
- |
Animal products. |
|
|
- |
Others. |
|
|
7. Was the enhancement of the recreational/tourist/cultural value of the area a specific goal? |
|
- |
Yes |
|
|
No |
|
- |
Unknown |
|
8. Was the creation of jobs a specific goal? |
|
- |
Yes |
|
|
No |
|
- |
Unknown |
Specify number and type (permanent/seasonal..): |
|
|