|
III. RESTORATION PROCESS
|
III.4. GENERAL TECHNICAL DESCRIPTION
|
1. Structures and facilities developed (if any) within the project. |
|
|
Roads: |
|
|
|
Fire protection ( fire breaks, ...): |
|
|
- |
Livestock (enclosure, passageways, etc.): |
|
|
- |
Recreational facilities, for children, school groups, tourist, other: |
|
|
- |
Technical measures of erosion control (ditches, dams,
etc.): |
|
|
|
Special measures for electrical lines or gas transmission pipes: |
fire breaks |
|
- |
Other infrastructure: |
|
|
2. Has any traditional technology been applied? |
Yes |
Description: |
Horizontal strips following the contours, made by hand or with horses. |
|
3. Has any innovative technology been applied? |
No |
Description: |
|
|
4. Are there any quality standards for the seedlings? |
|
- |
Yes |
|
|
No |
|
- |
Unknown |
|
5. Are there quality standards for the work? |
|
- |
Yes |
|
|
No |
|
- |
Unknown |
|
6. Are there defined success criteria for the project? |
Yes |
Description: |
mortality less than 20% |
|